Have your say: the draft Christchurch Northern Corridor (CNC) Downstream Effects Management Plan is open for public feedback. As a condition of the project’s consent, this plan is required before the CNC opens. The plan “recommends a programme of work to reduce the downstream effects of the CNC”, however not everyone is a fan. There is a ‘Can the Plan’ campaign underway in the local community, as can be seen on the front page of the latest St Albans News:

What’s in the plan?
The CNC is expected to open in late 2020. The draft management plan proposes three delivery stages for mitigation work: Continue reading “Residents voice views on downstream traffic plans”